DESIGN FOR ROCK
DESIGN FOR CONCRETE
MIXING AND FLLING
TIPES
SAFETY PRECATION
 
how to use > DESIGN FOR ROCK > LEAKAGE OF VIRGIN ROCK

 

The holes at the toe should be spaced closer together and successively broken from the front row.

d

44-51 mm

 

1 3/4-2"

L1

30-40 cm

1’-1’4"

L2

60-90 cm

2’-3’

D

Add 5% of Height

80°-90°

 

The front holes (up to the sixth row) may be simultaneously filled in. It is more effective for the removal to fill in 1 holes and then each two rows (2,,3) after a delay of 6-20 hours.

 

   